Study of 800MW IPP PV Power Plant in the Desert of MENA region

  • Client:

    Fichtner GmbH
  • Location:

    Private
  • Market:

    Transmission & Distribution
  • Year of completion:

    2018

Protasis scope:

  • Grid impact study of Renewable Energy System (RES) variation and spinning reserves requirements
  • Grid code compliance study
  • Electrical Power System Analysis
  • Software: PSS/E Siemens PTI

Analyze options for the integration of additional 1.000MW PV plant into the national electricity company system up to 2020 and a preliminary assessment of integrating up to 3.000MW until 2030. Studies performed by PROTASIS as subcontractor to Fichtner GmbH.