Digital Protection & Control for EHV Substation in Megalopolis Greece

  • Client:

    IPTO
  • Location:

    Greece
  • Market:

    Transmission & Distribution
  • Year of completion:

    2013

This key project for the Greek transmission system, commissioned by the Independent Power Transmission Operator (IPTO), concerns the Megalopolis 400 kV air-insulated extra-high-voltage (EHV) substation. With 36 bays and equipment operating at 400 kV, 150 kV and 30 kV, it is one of the largest extra-high-voltage substations in Greece.

PROTASIS’ scope of work included:

  • Short-circuit calculations and protection coordination studies
  • Design, supply and commissioning of the Substation Automation System (SAS)
  • Supply of all substation protection and control equipment
  • Supply of Remote Terminal Units (RTUs) for integration with IPTO’s remote control centre
  • Substation SCADA system development and commissioning
  • Substation commissioning and start-up